loader image
Project Overview

330kv transmission line Lafia- Pigba under construction


GisWorld supported the construction of the 330kV transmission line from Lafia to Pigba by providing detailed route alignment, topographic mapping, and geotechnical investigations. Our work guided tower placement and construction planning, contributing to improved power transmission capacity and grid stability in the North-Central region.

Project Details

Client Name: John Doe
Location: June 2024
Project Type: Residential
Area Size: 2,500 sq. ft.

Gallery

Project Showcase: Visual Highlights

Process Overview

Our Design Journey: Step-by-Step

Geotechnical investigation supports safe and efficient construction by evaluating subsurface conditions. It helps identify soil properties, groundwater levels, and potential site risks before design and execution. The design journey typically follows three key stages:

Site Reconnaissance & Data Collection

Visual inspection, desk studies, and review of existing maps, borehole logs, and geological records to understand the site context.

Field Investigation & Testing

Borehole drilling, sampling, in-situ tests (e.g. SPT, CPT), and geophysical surveys to determine soil stratigraphy, strength, and groundwater conditions.

Analysis, Reporting & Design Input

Laboratory testing, data analysis, and interpretation to generate geotechnical reports that guide foundation design, slope stability, and construction planning.

Testimonials

Our clients reviews

Subscribe to Our newsletter for latest updates

Please install/activate MC4WP: Mailchimp for WordPress plugin.

About Company

GisWorld Services Limited is incorporated in Nigeria with a specialization in Land Survey, Hydrographic Survey, Geophysical Survey, Remote Sensing, Real Estate consultancy, and Geographic Information System (GIS) services. 

Support

Request a Quote now

 Fill in the details, and our team will get back to you.

[wpforms id="2196"]